Raven Dancer arrived with a new aluminum enclosed fly-bridge shell. After insulation was installed all new console and cabinets were fabricated, window area’s were skinned and laminate applied so windows could be installed, new laminate on walls. We also moved helm to fly-bridge and closed off lower windows with fiberglass flat-stock and glassed in.